
Budget and 2050 Target Outcomes
- Budget
Up to56.64B¥
- CO2Reduction Effect
Approx.3Bt/yr
- Economic Effect
Approx.156T¥
Related Contents
Project Implementing Entities
○Concrete field
[Research and Development 1]
Development of concrete produced with maximized volumes of CO2 emissions reduction and CO2 fixation
[Research and Development 2]
Development of technology related to quality control/fixation evaluation methods for concrete produced with maximized volumes of CO2 emissions reduction and CO2 fixation
| Theme | Entity |
|---|---|
Development of materials, manufacturing methods, and a quality control system on innovative carbon negative concrete | ManagerKAJIMA CORPORATION |
| Denka Company Limited | |
| TAKENAKA CORPORATION | |
Development of carbon pool concrete and implementation in pavements and structures | ManagerHAZAMA ANDO CORPORATION |
| UCHIYAMA ADVANCE CO., LTD | |
| Haikou Onoda Remicon Co., Ltd. | |
| Osaka-Hyogo Ready-Mixed Concrete Industrial Association | |
| Taisei Rotec Corporation | |
| Central Research Institute of Electric Power Industry | |
R&D on standardization of evaluation methods for CO2 fixation in concrete | The University of Tokyo *Only implement Research and Development 2 |
○Cement field
[Research and Development 3]
Design and demonstration of CO2-recovering production process
[Research and Development 4]
Establishment of carbonic acid chloride technology using various calcium sources
| Theme | Entity |
|---|---|
Development of cement manufacturing process with CO2 recovery | ManagerTAIHEIYO CEMENT CORPORATION |
| Sumitomo Osaka Cement Co., Ltd. |
